Garner Valley SFSI Field Site Specifications
The following documents are available from the NEES Central database. For a list of similar documents for other NEES facilities, refer to NEES Central .
Zip File
Folder
Uncompressed File Contents
| General Specifications: |
|---|
| Guide to Instrumentation To be filled in |
| Component Interaction Diagram To be filled in |
| Geotechnical/Geophysical Specifications: |
| Spectral Analysis of Surface Waves Report To be filled in |
| Geotechnical Logs and Data (both field sites) To be filled in |
| GIS Compatible Site Map -Accelerometer.dbf description -Accelerometer.prj description -Accelerometer.sbn description ...more |
| Permeability Tests GVDA Permeability -GVDA P1-01.dat description -GVDA P2-01.dat description -GVDA P3-01.dat description -Perm_GVDA P1.xls description -Perm_GVDA P2.xls description -Perm_GVDA P3.xls description |
| Standard Penetration Test Data Atterberg -Atterberg.pdf description -SPT2-NS1_12.5-15.pdf description -SPT2-NS1_15.5-18.pdf description Borehole Logs -SPT1_Bore.xls description -SPT2-NS1_Bore.xls description Consolidation -SPT2_Consol_12.5.pdf description -SPT2_Consol_15.5.pdf description Hammer Energy Disk -SPT10050.RPM through SPT10440 description -SPT1_Hammer_E.rtf description Sample Pictures -X-ray Scans -SPT2-NS1_Scans.pdf description Specific Gravity -Gs.pdf description -READ ME.doc description -README.txt description UU Data -UU_SPT2_12.5-15.pdf description -UU_SPT2_15.5-18.pdf description |
| Survey Data -April 04 Survey notes.xls description -Garner.ssf description -Garner.ssf description |
| USGS CPT/SPT Tests CPD -RVC001.CPD - RVC005.CPD Seismic -001-0001.txt through 001-177X.txt description -nees_rvc_001.xls description PDF2 -rVC001.pdf through rvc005.pdf description -RVC_Masterlist.xls description -CPT Cross Section.pdf description |
| 1994 Shallow PS Suspension Log To be filled in |
| 1996 Deep PS Suspension Log To be filled in |
| 1996 GVDA Geophysical Site Characterization report To be filled in |
| SFSI Experimental Structure: |
| Manufacturer Documentation To be filled in |
| Interface to other Components To be filled in |
| Load Cell Calibration Report To be filled in |
| Digitexx Structural RTMS To be filled in |
| SFSI Construction Report To be filled in |

